Project
Fabrication and Installation of Chiller and Firefighting Piping Systems
Location
Cairo, Egypt
Description
The scope of work involved providing manpower, including field engineers and certified quality control engineers to conduct inspections and tests on welds and paint. Skilled technicians were also supplied for welding and installation of the chillers piping systems as well as the firefighting pumps and piping systems at the City Centre Mall in Cairo. Additionally, all required equipment was provided. The tasks covered everything from scaffolding works to the fabrication of all piping networks, as well as sandblasting and painting.
Owner
City Centre Mall
Lead Contractor
Debbas Group
Completion
2002
Project
Fabrication and Installation of Chiller and Firefighting Piping Systems
Location
Cairo, Egypt
Description
The scope of work involved providing manpower, including field engineers and certified quality control engineers to conduct inspections and tests on welds and paint. Skilled technicians were also supplied for welding and installation of the chillers piping systems as well as the firefighting pumps and piping systems at the City Centre Mall in Cairo. Additionally, all required equipment was provided. The tasks covered everything from scaffolding works to the fabrication of all piping networks, as well as sandblasting and painting.
Owner
City Centre Mall
Lead Contractor
Debbas Group
Completion
2002
Project
Fabrication and Installation of Chiller and Firefighting Piping Systems
Location
Khartoum, Sudan
Description
The scope of services included the deployment of qualified manpower, such as site engineers and certified QC inspectors, responsible for carrying out welding and coating inspections and related testing activities. Experienced technicians were assigned to execute welding, erection, and installation works for the chiller piping networks and the firefighting pumps and piping systems. All necessary tools, machinery, and equipment were supplied as part of the works. The activities encompassed the complete range of works, starting from scaffolding installation through to the fabrication and assembly of all piping systems, including surface preparation, sandblasting, and final painting works.
Lead Contractor
Drake & Scull
Completion
2015
Project
Fabrication and Installation of Chiller and Firefighting Piping Systems
Location
Khartoum, Sudan
Description
The scope of services included the deployment of qualified manpower, such as site engineers and certified QC inspectors, responsible for carrying out welding and coating inspections and related testing activities. Experienced technicians were assigned to execute welding, erection, and installation works for the chiller piping networks and the firefighting pumps and piping systems. All necessary tools, machinery, and equipment were supplied as part of the works. The activities encompassed the complete range of works, starting from scaffolding installation through to the fabrication and assembly of all piping systems, including surface preparation, sandblasting, and final painting works.
Lead Contractor
Drake & Scull
Completion
2015