© Copyright 2025
Project
Offshore Pipeline Installation
Location
Oyoun Moussa, Red Sea
Description
Construction of an offshore pipeline was carried out at the Oyoun Moussa Electricity Station to supply it with Mazot. The operations included submerging and laying the pipeline on the seabed, welding, and installation. The pipeline, with an 8-inch diameter and SCH 160 rating, spans a total length of 3 kilometers.
Owner
Ministry of Electricity and Renewable Energy
Egyptian Electricity Holding Company
Lead Contractor
Maridive & Oil Services
Completion
2005
Project
Offshore Pipeline Installation
Location
Oyoun Moussa, Red Sea
Description
Construction of an offshore pipeline was carried out at the Oyoun Moussa Electricity Station to supply it with Mazot. The operations included submerging and laying the pipeline on the seabed, welding, and installation. The pipeline, with an 8-inch diameter and SCH 160 rating, spans a total length of 3 kilometers.
Owner
Ministry of Electricity and Renewable Energy
Egyptian Electricity Holding Company
Lead Contractor
Maridive & Oil Services
Completion
2005
Project
Offshore Platform Maintenance
Location
Ras Ghareb, Red Sea
Description
The scope of work included decommissioning the existing boat-landing due to wear and tear, fabricating and erecting a new one, and performing comprehensive maintenance on the Amal (A) Platform structure to ensure operational efficiency and safety.
Owner
Al-Amal Petroleum Company (AMAPETCO)
Completion
2013
Project
Offshore Platform Maintenance
Location
Ras Ghareb, Red Sea
Description
The scope of work included decommissioning the existing boat-landing due to wear and tear, fabricating and erecting a new one, and performing comprehensive maintenance on the Amal (A) Platform structure to ensure operational efficiency and safety.
Owner
Al-Amal Petroleum Company (AMAPETCO)
Completion
2013
Project
Offshore Pipeline Installation
Location
Abu Rudeis, Red Sea
Description
The installation of an offshore pipeline extension for transporting crude oil from offshore wells to an onshore separation station was successfully completed. The pipeline extension, with a 10-inch diameter and SCH 80 rating, spans a total length of 1 kilometer.
As part of the project, two steel structures were constructed: one to house the power generator and the other to accommodate the pumps station, both designed to support the pipeline's operations. The scope of work included welding the pipeline parts, assembling the necessary infrastructure, and transporting materials to the onshore site.
To ensure the pipeline's safety and operational efficiency, various tests were conducted, including hydrostatic pressure tests and integrity assessments. These tests were crucial in confirming the pipeline's reliability and readiness for operation.
Owner
Misr Petroleum Company
Completion
2014
Project
Offshore Pipeline Installation
Location
Abu Rudeis, Red Sea
Description
The installation of an offshore pipeline extension for transporting crude oil from offshore wells to an onshore separation station was successfully completed. The pipeline extension, with a 10-inch diameter and SCH 80 rating, spans a total length of 1 kilometer.
As part of the project, two steel structures were constructed: one to house the power generator and the other to accommodate the pumps station, both designed to support the pipeline's operations. The scope of work included welding the pipeline parts, assembling the necessary infrastructure, and transporting materials to the onshore site.
To ensure the pipeline's safety and operational efficiency, various tests were conducted, including hydrostatic pressure tests and integrity assessments. These tests were crucial in confirming the pipeline's reliability and readiness for operation.
Owner
Misr Petroleum Company
Completion
2014
Project
Offshore Platform Extension Fabrication and Installation
Location
Ras Ghareb, Red Sea
Description
The fabrication and installation of a steel extension for Zeitco’s Platform (A) were successfully completed. The extension was designed to increase capacity and enhance safety features of the platform. The scope of work included welding, testing, erecting, sandblasting, and painting.
Owner
East Zeit Petroleum Company (Zeitco)
Completion
2015
Project
Offshore Platform Extension Fabrication and Installation
Location
Ras Ghareb, Red Sea
Description
The fabrication and installation of a steel extension for Zeitco’s Platform (A) were successfully completed. The extension was designed to increase capacity and enhance safety features of the platform. The scope of work included welding, testing, erecting, sandblasting, and painting.
Owner
East Zeit Petroleum Company (Zeitco)
Completion
2015
Project
Comprehensive Offshore Platform Maintenance
Location
Ras Ghareb, Red Sea
Description
El-Kholy Contractors secured a comprehensive 5-year maintenance contract with SUCO. This contract included the maintenance of all offshore platforms in the Red Sea Region, such as the SWGEZ, RF-A, and RF-B platforms.
The scope of work involved the provision of skilled manpower, such as field engineers and certified quality control engineers, to carry out rigorous inspections and tests on welds and coatings.
Additionally, offshore maintenance crews were tasked with a variety of responsibilities, including scaffolding, the fabrication and upkeep of piping networks, sandblasting, and painting. To ensure the highest quality of work, El-Kholy Contractors also provided state-of-the-art equipment for all maintenance activities.
Owner
SUCO
Completion
2020
Project
Comprehensive Offshore Platform Maintenance
Location
Ras Ghareb, Red Sea
Description
El-Kholy Contractors secured a comprehensive 5-year maintenance contract with SUCO. This contract included the maintenance of all offshore platforms in the Red Sea Region, such as the SWGEZ, RF-A, and RF-B platforms.
The scope of work involved the provision of skilled manpower, such as field engineers and certified quality control engineers, to carry out rigorous inspections and tests on welds and coatings.
Additionally, offshore maintenance crews were tasked with a variety of responsibilities, including scaffolding, the fabrication and upkeep of piping networks, sandblasting, and painting. To ensure the highest quality of work, El-Kholy Contractors also provided state-of-the-art equipment for all maintenance activities.
Owner
SUCO
Completion
2020
Project
Civil Revamping & Comprehensive Offshore Platform Maintenance
Location
Abu Qir, Alexandria
Description
This multi-task project involves civil revamping and comprehensive offshore platform maintenance. Key tasks include:
All works were carried out at platforms P-I, P-II, and P-III.
Owner
Abu-Qir Petroleum
Completion
2023 – Ongoing
Project
Civil Revamping and Comprehensive Offshore Platform Maintenance
Location
Abu Qir, Alexandria
Description
This multi-task project involves civil revamping and comprehensive offshore platform maintenance. Key tasks include:
All works were carried out at platforms P-I, P-II, and P-III.
Owner
Abu-Qir Petroleum Co.
Completion
2023 – Ongoing
Project
Offshore Platform Boat-Landing Maintenance
Location
Red Sea, Egypt
Description
An offshore and diving services project in collaboration with the Egyptian Maintenance Company (EMC). The scope of work involved the fabrication, welding, testing, and installation of a new boat-landing, equipped with rubber and tire fenders. As part of the project, the dismantling of the existing boat-landing was carried out. All work, including diving services and underwater structure repairs, was executed at Platform WP-C.
Owner
PETROGULF
Lead Contractor
Egyptian Maintenance Company
Completion
2018
Project
Offshore Platform Boat-Landing Maintenance
Location
Red Sea, Egypt
Description
An offshore and diving services project in collaboration with the Egyptian Maintenance Company (EMC). The scope of work involved the fabrication, welding, testing, and installation of a new boat-landing, equipped with rubber and tire fenders. As part of the project, the dismantling of the existing boat-landing was carried out. All work, including diving services and underwater structure repairs, was executed at Platform WP-C.
Owner
PETROGULF
Lead Contractor
Egyptian Maintenance Company
Completion
2018
Project
Comprehensive Maintenance of Various-Sized Storage Tanks
Location
Zeit Bay, Red Sea
Description
Comprehensive maintenance of 3 storage tanks. The scope of work included necessary welding, testing, sandblasting, and repainting operations of tanks’ bodies, as well as full replacement of the firefighting system.
Owner
East Zeit Petroleum Company (Zeitco)
Completion
2007
Project
Comprehensive Maintenance of Various-Sized Storage Tanks
Location
Zeit Bay, Red Sea
Description
Comprehensive maintenance of 3 storage tanks. The scope of work included necessary welding, testing, sandblasting, and repainting operations of tanks’ bodies, as well as full replacement of the firefighting system.
Owner
East Zeit Petroleum Company (Zeitco)
Completion
2007
Project
Construction of Various-Sized Storage Tanks
Location
El-Alamein, Western Desert, Egypt
Description
Construction and installation of 6 various-sized storage tanks. The scope of work involved fabrication operations which took place within our workshop. Fabrication included welding, testing, sandblasting, and painting, as well as transporting tanks to site using our equipment.
Owner
South Dabaa Petroleum Co. (DAPETCO)
Completion
2006
Project
Construction of Various-Sized Storage Tanks
Location
El-Alamein, Western Desert, Egypt
Description
Construction and installation of 6 various-sized storage tanks. The scope of work involved fabrication operations which took place within our workshop. Fabrication included welding, testing, sandblasting, and painting, as well as transporting tanks to site using our equipment.
Owner
South Dabaa Petroleum Co. (DAPETCO)
Completion
2006
Project
Firefighting and HVAC Systems Remediation
Location
Hurghada, Sharm El-Sheikh, and Port Said
Description
Complete remediation of firefighting and HVAC systems in General Electric working sites in Hurghada, Sharm El-Sheikh, and Port Said.
Owner
General Electric
Lead Contractor
KOONTZ-WAGNER
Completion
2017
Project
Firefighting and HVAC Systems Remediation
Location
Hurghada, Sharm El-Sheikh, and Port Said
Description
Complete remediation of firefighting and HVAC systems in General Electric working sites in Hurghada, Sharm El-Sheikh, and Port Said.
Owner
General Electric
Main Contractor
KOONTZ WAGNER
Completion
2017
Project
T-Oil Station Development
Location
Abu-Senan, Western Desert, Egypt
Description
The project involved:
Owner
General Petroleum Company
Completion
2019
Project
T-Oil Station Development
Location
Abu-Senan, Western Desert, Egypt
Description
The project involved:
Owner
General Petroleum Company
Completion
2019
Project
Storage Tanks Construction and Station Development
Location
El-Max, Alexandria
Description
The project involved:
Owner
Petroleum Cooperative Society Company
Completion
2024
Project
Storage Tanks Construction and Station Development
Location
El-Max, Alexandria
Description
The project involved:
Owner
Petroleum Cooperative Society Company
Completion
2024
Project
Medium Voltage Power Cable Installation
Location
Rahmi Concession, Red Sea Region
Description
The project involved the extension of a 5-kilometer medium voltage power cable, along with the associated civil works. Additionally, it included the supply, installation, and testing of 9ea splicing kits, 2ea end termination kits, and 2ea cable glands.
Owner
PETRONEFERTITI
Completion
2022
Project
Medium Voltage Power Cable Installation
Location
Rahmi Concession, Red Sea Region
Description
The project involved the extension of a 5-kilometer medium voltage power cable, along with the associated civil works. Additionally, it included the supply, installation, and testing of 9ea splicing kits, 2ea end termination kits, and 2ea cable glands.
Owner
PETRONEFERTITI
Completion
2022
Project
Pump Installation
Location
Tarek and El-Salam Gas Fields, Western Desert, Egypt
Description
The scope of work involved the installation of a pump to inject saltwater into wells, including tasks such as welding, testing, sandblasting, and painting.
Owner
Khalda Petroleum Company
Completion
1997
Project
Pump Installation
Location
Tarek and El-Salam Gas Fields, Western Desert, Egypt
Description
The scope of work involved the installation of a pump to inject saltwater into wells, including tasks such as welding, testing, sandblasting, and painting.
Owner
Khalda Petroleum Company
Completion
1997
Project
Fabrication and Installation of Chiller and Firefighting Piping Systems
Location
Cairo, Egypt
Description
The scope of work involved providing manpower, including field engineers and certified quality control engineers to conduct inspections and tests on welds and paint. Skilled technicians were also supplied for welding and installation operations of the chillers piping systems and firefighting pumps and piping systems at City Centre Mall in Cairo. Additionally, top-tier equipment was provided. The tasks covered everything from scaffolding to the fabrication of all piping networks, as well as services such as sandblasting and painting.
Owner
City Centre Mall
Lead Contractor
Debbas Group
Completion
2002
Project
Fabrication and Installation of Chiller and Firefighting Piping Systems
Location
Cairo, Egypt
Description
The scope of work involved providing manpower, including field engineers and certified quality control engineers to conduct inspections and tests on welds and paint. Skilled technicians were also supplied for welding and installation operations of the chillers piping systems and firefighting pumps and piping systems at City Centre Mall in Cairo. Additionally, top-tier equipment was provided. The tasks covered everything from scaffolding to the fabrication of all piping networks, as well as services such as sandblasting and painting.
Owner
City Centre Mall
Lead Contractor
Debbas Group
Completion
2002
Project
Fabrication and Installation of Chiller and Firefighting Piping Systems
Location
Khartoum, Sudan
Description
The scope of work included providing manpower, such as field engineers and certified quality control engineers, to conduct inspections and tests on welds and paint. Additionally, skilled technicians were supplied for welding and installation operations of chillers piping systems and firefighting pumps and piping systems, along with state-of-the-art equipment. The tasks covered everything from scaffolding to the fabrication of all piping networks. Services also included sandblasting and painting.
Lead Contractor
Drake & Scull
Completion
2015
Project
Fabrication and Installation of Chiller and Firefighting Piping Systems
Location
Khartoum, Sudan
Description
The scope of work included providing manpower, such as field engineers and certified quality control engineers, to conduct inspections and tests on welds and paint. Additionally, skilled technicians were supplied for welding and installation operations of chillers piping systems and firefighting pumps and piping systems, along with state-of-the-art equipment. The tasks covered everything from scaffolding to the fabrication of all piping networks. Services also included sandblasting and painting.
Lead Contractor
Drake & Scull
Completion
2015
Project
Oil Pumps Replacement
Location
Eastern Desert, Egypt
Description
The project scope involved replacing 6 oil pumps to transport oil from the fields in Ras Ghareb to the storage tanks. Additionally, it included maintaining the steel-structured oil pump chamber, which involved replacing the piping network, sandblasting, and repainting.
Owner
General Petroleum Company
Completion
2019
Project
Oil Pumps Replacement
Location
Eastern Desert, Egypt
Description
The project scope involved replacing 6 oil pumps to transport oil from the fields in Ras Ghareb to the storage tanks. Additionally, it included maintaining the steel-structured oil pump chamber, which involved replacing the piping network, sandblasting, and repainting.
Owner
General Petroleum Company
Completion
2019
Project
El-Ossrah Sugar Factory - Steel Structure Construction
Location
El-Ain El-Sokhna
Description
This project involved constructing the steel structures for the production section at El-Ossrah Sugar Factory, including the fabrication and installation of all handrails and grating.
Lead Contractor
SIAC Construction
Completion
2013
Project
El-Ossrah Sugar Factory - Steel Structure Construction
Location
El-Ain El-Sokhna
Description
This project involved constructing the steel structures for the production section at El-Ossrah Sugar Factory, including the fabrication and installation of all handrails and grating.
Lead Contractor
SIAC Construction
Completion
2013
Project
Al Nouran Sugar Factory
Location
El-Saleheyah El-Gedeedah
Description
Over a two-year period, the project encompassed the supply, fabrication, and installation of the factory’s steel structure, totaling nearly 1,200 tons of steel. The scope further involved fabricating and installing three SS316L storage tanks of various sizes, along with six stainless steel silo tanks. The tanks were integrated with a comprehensive piping network within the packaging area. Additionally, sandblasting, followed by the application of protective coatings were executed to ensure durability.
Owner
Al Nouran Sugar Factory
Completion
2016
Project
Al Nouran Sugar Factory
Location
El-Saleheyah El-Gedeedah
Description
Over a two-year period, the project encompassed the supply, fabrication, and installation of the factory’s steel structure, totaling nearly 1,200 tons of steel. The scope further involved fabricating and installing three SS316L storage tanks of various sizes, along with six stainless steel silo tanks. The tanks were integrated with a comprehensive piping network within the packaging area. Additionally, sandblasting, followed by the application of protective coatings were executed to ensure durability.
Owner
Al Nouran Sugar Factory
Completion
2016