PROJECTS

SELECTED MAJOR PROJECTS

PROJECTS

MORE OFFSHORE INFRASTRUCTURE

Project

Offshore Pipeline Installation

Location

Oyoun Moussa, Red Sea

Description

Construction of an offshore pipeline was carried out at the Oyoun Moussa Electricity Station to supply it with Mazot. The operations included submerging and laying the pipeline on the seabed, welding, and installation. The pipeline, with an 8-inch diameter and SCH 160 rating, spans a total length of 3 kilometers.

Owner

Ministry of Electricity and Renewable Energy
Egyptian Electricity Holding Company

Lead Contractor

Maridive & Oil Services

Completion

2005

Project

Offshore Pipeline Installation

Location

Oyoun Moussa, Red Sea

Description

Construction of an offshore pipeline was carried out at the Oyoun Moussa Electricity Station to supply it with Mazot. The operations included submerging and laying the pipeline on the seabed, welding, and installation. The pipeline, with an 8-inch diameter and SCH 160 rating, spans a total length of 3 kilometers.

Owner

Ministry of Electricity and Renewable Energy
Egyptian Electricity Holding Company

Lead Contractor

Maridive & Oil Services

Completion

2005

Project

Offshore Platform Maintenance

Location

Ras Ghareb, Red Sea

Description

The scope of work included decommissioning the existing boat-landing due to wear and tear, fabricating and erecting a new one, and performing comprehensive maintenance on the Amal (A) Platform structure to ensure operational efficiency and safety.

Owner

Al-Amal Petroleum Company (AMAPETCO)

Completion

2013

Project

Offshore Platform Maintenance

Location

Ras Ghareb, Red Sea

Description

The scope of work included decommissioning the existing boat-landing due to wear and tear, fabricating and erecting a new one, and performing comprehensive maintenance on the Amal (A) Platform structure to ensure operational efficiency and safety.

Owner

Al-Amal Petroleum Company (AMAPETCO)

Completion

2013

Project

Offshore Pipeline Installation

Location

Abu Rudeis, Red Sea

Description

The installation of an offshore pipeline extension for transporting crude oil from offshore wells to an onshore separation station was successfully completed. The pipeline extension, with a 10-inch diameter and SCH 80 rating, spans a total length of 1 kilometer.

As part of the project, two steel structures were constructed: one to house the power generator and the other to accommodate the pumps station, both designed to support the pipeline's operations. The scope of work included welding the pipeline parts, assembling the necessary infrastructure, and transporting materials to the onshore site.

To ensure the pipeline's safety and operational efficiency, various tests were conducted, including hydrostatic pressure tests and integrity assessments. These tests were crucial in confirming the pipeline's reliability and readiness for operation.

Owner

Misr Petroleum Company

Completion

2014

Project

Offshore Pipeline Installation

Location

Abu Rudeis, Red Sea

Description

The installation of an offshore pipeline extension for transporting crude oil from offshore wells to an onshore separation station was successfully completed. The pipeline extension, with a 10-inch diameter and SCH 80 rating, spans a total length of 1 kilometer.

As part of the project, two steel structures were constructed: one to house the power generator and the other to accommodate the pumps station, both designed to support the pipeline's operations. The scope of work included welding the pipeline parts, assembling the necessary infrastructure, and transporting materials to the onshore site.

To ensure the pipeline's safety and operational efficiency, various tests were conducted, including hydrostatic pressure tests and integrity assessments. These tests were crucial in confirming the pipeline's reliability and readiness for operation.

Owner

Misr Petroleum Company

Completion

2014

Project

Offshore Platform Extension Fabrication and Installation

Location

Ras Ghareb, Red Sea

Description

The fabrication and installation of a steel extension for Zeitco’s Platform (A) were successfully completed. The extension was designed to increase capacity and enhance safety features of the platform. The scope of work included welding, testing, erecting, sandblasting, and painting.

Owner

East Zeit Petroleum Company (Zeitco)

Completion

2015

Project

Offshore Platform Extension Fabrication and Installation

Location

Ras Ghareb, Red Sea

Description

The fabrication and installation of a steel extension for Zeitco’s Platform (A) were successfully completed. The extension was designed to increase capacity and enhance safety features of the platform. The scope of work included welding, testing, erecting, sandblasting, and painting.

Owner

East Zeit Petroleum Company (Zeitco)

Completion

2015

Project

Comprehensive Offshore Platform Maintenance

Location

Ras Ghareb, Red Sea

Description

El-Kholy Contractors secured a comprehensive 5-year maintenance contract with SUCO. This contract included the maintenance of all offshore platforms in the Red Sea Region, such as the SWGEZ, RF-A, and RF-B platforms.

The scope of work involved the provision of skilled manpower, such as field engineers and certified quality control engineers, to carry out rigorous inspections and tests on welds and coatings.

Additionally, offshore maintenance crews were tasked with a variety of responsibilities, including scaffolding, the fabrication and upkeep of piping networks, sandblasting, and painting. To ensure the highest quality of work, El-Kholy Contractors also provided state-of-the-art equipment for all maintenance activities.

Owner

SUCO

Completion

2020

Project

Comprehensive Offshore Platform Maintenance

Location

Ras Ghareb, Red Sea

Description

El-Kholy Contractors secured a comprehensive 5-year maintenance contract with SUCO. This contract included the maintenance of all offshore platforms in the Red Sea Region, such as the SWGEZ, RF-A, and RF-B platforms.

The scope of work involved the provision of skilled manpower, such as field engineers and certified quality control engineers, to carry out rigorous inspections and tests on welds and coatings.

Additionally, offshore maintenance crews were tasked with a variety of responsibilities, including scaffolding, the fabrication and upkeep of piping networks, sandblasting, and painting. To ensure the highest quality of work, El-Kholy Contractors also provided state-of-the-art equipment for all maintenance activities.

Owner

SUCO

Completion

2020

Project

Civil Revamping & Comprehensive Offshore Platform Maintenance

Location

Abu Qir, Alexandria

Description

This multi-task project involves civil revamping and comprehensive offshore platform maintenance. Key tasks include:

  • Supply and installation of anti-explosion and anti-fire doors.
  • Sandblasting and coating of the platform’s living quarters and other parts of the platform.
  • Supply and installation of epoxy-coated flooring for control rooms and battery chambers.
  • Renewal of water and steam piping networks.
  • Civil revamping of electrical systems.
  • Steel structure works, including installation, sandblasting, and painting.
  • Supply, fabrication, and installation of 3 clamps at depths of 9 meters and 21 meters.
  • Diving operations for clamp installation.

All works were carried out at platforms P-I, P-II, and P-III.

Owner

Abu-Qir Petroleum

Completion

2023 – Ongoing

Project

Civil Revamping and Comprehensive Offshore Platform Maintenance

Location

Abu Qir, Alexandria

Description

This multi-task project involves civil revamping and comprehensive offshore platform maintenance. Key tasks include:

  • Supply and installation of anti-explosion and anti-fire doors.
  • Sandblasting and coating of the platform’s living quarters and other parts of the platform.
  • Supply and installation of epoxy-coated flooring for control rooms and battery chambers.
  • Renewal of water and steam piping networks.
  • Civil revamping of electrical systems.
  • Steel structure works, including installation, sandblasting, and painting.
  • Supply, fabrication, and installation of 3 clamps at depths of 9 meters and 21 meters.
  • Diving operations for clamp installation.

All works were carried out at platforms P-I, P-II, and P-III.

Owner

Abu-Qir Petroleum Co.

Completion

2023 – Ongoing

Project

Offshore Platform Boat-Landing Maintenance

Location

Red Sea, Egypt

Description

An offshore and diving services project in collaboration with the Egyptian Maintenance Company (EMC). The scope of work involved the fabrication, welding, testing, and installation of a new boat-landing, equipped with rubber and tire fenders. As part of the project, the dismantling of the existing boat-landing was carried out. All work, including diving services and underwater structure repairs, was executed at Platform WP-C.

Owner

PETROGULF

Lead Contractor

Egyptian Maintenance Company

Completion

2018

Project

Offshore Platform Boat-Landing Maintenance

Location

Red Sea, Egypt

Description

An offshore and diving services project in collaboration with the Egyptian Maintenance Company (EMC). The scope of work involved the fabrication, welding, testing, and installation of a new boat-landing, equipped with rubber and tire fenders. As part of the project, the dismantling of the existing boat-landing was carried out. All work, including diving services and underwater structure repairs, was executed at Platform WP-C.

Owner

PETROGULF

Lead Contractor

Egyptian Maintenance Company

Completion

2018

PROJECTS

MORE ENERGY

Project

Comprehensive Maintenance of Various-Sized Storage Tanks

Location

Zeit Bay, Red Sea

Description

Comprehensive maintenance of 3 storage tanks. The scope of work included necessary welding, testing, sandblasting, and repainting operations of tanks’ bodies, as well as full replacement of the firefighting system.

Owner

East Zeit Petroleum Company (Zeitco)

Completion

2007

Project

Comprehensive Maintenance of Various-Sized Storage Tanks

Location

Zeit Bay, Red Sea

Description

Comprehensive maintenance of 3 storage tanks. The scope of work included necessary welding, testing, sandblasting, and repainting operations of tanks’ bodies, as well as full replacement of the firefighting system.

Owner

East Zeit Petroleum Company (Zeitco)

Completion

2007

Project

Construction of Various-Sized Storage Tanks

Location

El-Alamein, Western Desert, Egypt

Description

Construction and installation of 6 various-sized storage tanks. The scope of work involved fabrication operations which took place within our workshop. Fabrication included welding, testing, sandblasting, and painting, as well as transporting tanks to site using our equipment.

Owner

South Dabaa Petroleum Co. (DAPETCO)

Completion

2006

Project

Construction of Various-Sized Storage Tanks

Location

El-Alamein, Western Desert, Egypt

Description

Construction and installation of 6 various-sized storage tanks. The scope of work involved fabrication operations which took place within our workshop. Fabrication included welding, testing, sandblasting, and painting, as well as transporting tanks to site using our equipment.

Owner

South Dabaa Petroleum Co. (DAPETCO)

Completion

2006

Project

Firefighting and HVAC Systems Remediation

Location

Hurghada, Sharm El-Sheikh, and Port Said

Description

Complete remediation of firefighting and HVAC systems in General Electric working sites in Hurghada, Sharm El-Sheikh, and Port Said.

Owner

General Electric

Lead Contractor

KOONTZ-WAGNER

Completion

2017

Project

Firefighting and HVAC Systems Remediation

Location

Hurghada, Sharm El-Sheikh, and Port Said

Description

Complete remediation of firefighting and HVAC systems in General Electric working sites in Hurghada, Sharm El-Sheikh, and Port Said.

Owner

General Electric

Main Contractor

KOONTZ WAGNER

Completion

2017

Project

T-Oil Station Development

Location

Abu-Senan, Western Desert, Egypt

Description

The project involved:

  • Sandblasting and painting of 3 storage tanks, each with a capacity of 385 cubic meters.
  • Development of the station’s drainage network.
  • Fabrication and installation of seven lighting towers including all lighting fixtures and connections.
  • Installation and connection of a diesel pump and its control board.
  • Supplying, installing, testing, and commissioning of two jockey pumps and connecting them to the firefighting network.
  • Supplying and installing the station’s foam skid system and constructing a steel-structured control unit chamber.
  • Supplying, installing, laying, welding, and testing the firefighting network within the station, including the installation of the steel-structured chamber that houses the valves, hydrants, and all network accessories.
  • Construction of a steel-structured firefighting pump chamber and supply of an overhead crane at the station.
  • Construction of a canopy for the air compressor at the condensate plant.

Owner

General Petroleum Company

Completion

2019

Project

T-Oil Station Development

Location

Abu-Senan, Western Desert, Egypt

Description

The project involved:

  • Sandblasting and painting of 3 storage tanks, each with a capacity of 385 cubic meters.
  • Development of the station’s drainage network.
  • Fabrication and installation of seven lighting towers including all lighting fixtures and connections.
  • Installation and connection of a diesel pump and its control board.
  • Supplying, installing, testing, and commissioning of two jockey pumps and connecting them to the firefighting network.
  • Supplying and installing the station’s foam skid system and constructing a steel-structured control unit chamber.
  • Supplying, installing, laying, and welding the firefighting network within the station, including the installation of the steel-structured chamber that houses the valves, hydrants, and all network accessories.
  • Construction of a steel-structured firefighting pump chamber and supply of an overhead crane at the station.
  • Construction of a firefighting pump chamber and supply of an overhead crane at the station.
  • Construction of a canopy for the air compressor at the condensate plant.

Owner

General Petroleum Company

Completion

2019

Project

Storage Tanks Construction and Station Development

Location

El-Max, Alexandria

Description

The project involved:

  • Complete fabrication and installation of 2 gasoline storage tanks, with capacities of 1,000 and 2,000 cubic meters, each equipped with an internal floating roof. The scope of work also included sandblasting and painting.
  • Development of the station’s drainage network.
  • Fabrication and installation of lighting towers including all lighting fixtures and connections.
  • Installation and connection of a diesel pump and its control board.
  • Supplying, installing, testing, and commissioning of two jockey pumps and connecting them to the firefighting network.
  • Supplying and installing the station’s foam skid system and constructing a steel-structured control unit chamber.
  • Supplying, installing, laying, welding, and testing the firefighting network within the station, including the installation of the steel-structured chamber that houses the valves, hydrants, and all network accessories.

Owner

Petroleum Cooperative Society Company

Completion

2024

Project

Storage Tanks Construction and Station Development

Location

El-Max, Alexandria

Description

The project involved:

  • Complete fabrication and installation of 2 gasoline storage tanks, with capacities of 1,000 and 2,000 cubic meters, each equipped with an internal floating roof. The scope of work also included sandblasting and painting.
  • Development of the station’s drainage network.
  • Fabrication and installation of lighting towers including all lighting fixtures and connections.
  • Installation and connection of a diesel pump and its control board.
  • Supplying, installing, testing, and commissioning of two jockey pumps and connecting them to the firefighting network.
  • Supplying and installing the station’s foam skid system and constructing a steel-structured control unit chamber.
  • Supplying, installing, laying, welding, and testing the firefighting network within the station, including the installation of the steel-structured chamber that houses the valves, hydrants, and all network accessories.

Owner

Petroleum Cooperative Society Company

Completion

2024

Project

Medium Voltage Power Cable Installation

Location

Rahmi Concession, Red Sea Region

Description

The project involved the extension of a 5-kilometer medium voltage power cable, along with the associated civil works. Additionally, it included the supply, installation, and testing of 9ea splicing kits, 2ea end termination kits, and 2ea cable glands.

Owner

PETRONEFERTITI

Completion

2022

Project

Medium Voltage Power Cable Installation

Location

Rahmi Concession, Red Sea Region

Description

The project involved the extension of a 5-kilometer medium voltage power cable, along with the associated civil works. Additionally, it included the supply, installation, and testing of 9ea splicing kits, 2ea end termination kits, and 2ea cable glands.

Owner

PETRONEFERTITI

Completion

2022

PROJECTS

MORE PIPELINES AND PIPING

Project

Pump Installation

Location

Tarek and El-Salam Gas Fields, Western Desert, Egypt

Description

The scope of work involved the installation of a pump to inject saltwater into wells, including tasks such as welding, testing, sandblasting, and painting.

Owner

Khalda Petroleum Company

Completion

1997

Project

Pump Installation

Location

Tarek and El-Salam Gas Fields, Western Desert, Egypt

Description

The scope of work involved the installation of a pump to inject saltwater into wells, including tasks such as welding, testing, sandblasting, and painting.

Owner

Khalda Petroleum Company

Completion

1997

Project

Fabrication and Installation of Chiller and Firefighting Piping Systems

Location

Cairo, Egypt

Description

The scope of work involved providing manpower, including field engineers and certified quality control engineers to conduct inspections and tests on welds and paint. Skilled technicians were also supplied for welding and installation operations of the chillers piping systems and firefighting pumps and piping systems at City Centre Mall in Cairo. Additionally, top-tier equipment was provided. The tasks covered everything from scaffolding to the fabrication of all piping networks, as well as services such as sandblasting and painting.

Owner

City Centre Mall

Lead Contractor

Debbas Group

Completion

2002

Project

Fabrication and Installation of Chiller and Firefighting Piping Systems

Location

Cairo, Egypt

Description

The scope of work involved providing manpower, including field engineers and certified quality control engineers to conduct inspections and tests on welds and paint. Skilled technicians were also supplied for welding and installation operations of the chillers piping systems and firefighting pumps and piping systems at City Centre Mall in Cairo. Additionally, top-tier equipment was provided. The tasks covered everything from scaffolding to the fabrication of all piping networks, as well as services such as sandblasting and painting.

Owner

City Centre Mall

Lead Contractor

Debbas Group

Completion

2002

Project

Fabrication and Installation of Chiller and Firefighting Piping Systems

Location

Khartoum, Sudan

Description

The scope of work included providing manpower, such as field engineers and certified quality control engineers, to conduct inspections and tests on welds and paint. Additionally, skilled technicians were supplied for welding and installation operations of chillers piping systems and firefighting pumps and piping systems, along with state-of-the-art equipment. The tasks covered everything from scaffolding to the fabrication of all piping networks. Services also included sandblasting and painting.

Lead Contractor

Drake & Scull

Completion

2015

Project

Fabrication and Installation of Chiller and Firefighting Piping Systems

Location

Khartoum, Sudan

Description

The scope of work included providing manpower, such as field engineers and certified quality control engineers, to conduct inspections and tests on welds and paint. Additionally, skilled technicians were supplied for welding and installation operations of chillers piping systems and firefighting pumps and piping systems, along with state-of-the-art equipment. The tasks covered everything from scaffolding to the fabrication of all piping networks. Services also included sandblasting and painting.

Lead Contractor

Drake & Scull

Completion

2015

Project

Oil Pumps Replacement

Location

Eastern Desert, Egypt

Description

The project scope involved replacing 6 oil pumps to transport oil from the fields in Ras Ghareb to the storage tanks. Additionally, it included maintaining the steel-structured oil pump chamber, which involved replacing the piping network, sandblasting, and repainting.

Owner

General Petroleum Company

Completion

2019

Project

Oil Pumps Replacement

Location

Eastern Desert, Egypt

Description

The project scope involved replacing 6 oil pumps to transport oil from the fields in Ras Ghareb to the storage tanks. Additionally, it included maintaining the steel-structured oil pump chamber, which involved replacing the piping network, sandblasting, and repainting.

Owner

General Petroleum Company

Completion

2019

PROJECTS

FOOD INDUSTRIES

Project

El-Ossrah Sugar Factory - Steel Structure Construction

Location

El-Ain El-Sokhna

Description

This project involved constructing the steel structures for the production section at El-Ossrah Sugar Factory, including the fabrication and installation of all handrails and grating.

Lead Contractor

SIAC Construction

Completion

2013

Project

El-Ossrah Sugar Factory - Steel Structure Construction

Location

El-Ain El-Sokhna

Description

This project involved constructing the steel structures for the production section at El-Ossrah Sugar Factory, including the fabrication and installation of all handrails and grating.

Lead Contractor

SIAC Construction

Completion

2013

Project

Al Nouran Sugar Factory

Location

El-Saleheyah El-Gedeedah

Description

Over a two-year period, the project encompassed the supply, fabrication, and installation of the factory’s steel structure, totaling nearly 1,200 tons of steel. The scope further involved fabricating and installing three SS316L storage tanks of various sizes, along with six stainless steel silo tanks. The tanks were integrated with a comprehensive piping network within the packaging area. Additionally, sandblasting, followed by the application of protective coatings were executed to ensure durability.

Owner

Al Nouran Sugar Factory

Completion

2016

Project

Al Nouran Sugar Factory

Location

El-Saleheyah El-Gedeedah

Description

Over a two-year period, the project encompassed the supply, fabrication, and installation of the factory’s steel structure, totaling nearly 1,200 tons of steel. The scope further involved fabricating and installing three SS316L storage tanks of various sizes, along with six stainless steel silo tanks. The tanks were integrated with a comprehensive piping network within the packaging area. Additionally, sandblasting, followed by the application of protective coatings were executed to ensure durability.

Owner

Al Nouran Sugar Factory

Completion

2016