PROJECTS

ONSHORE ENERGY INFRASTRUCTURE PROJECTS

Gas Pipeline, Piping Systems, and Steel Structures Construction
Tarek & El-Salam Gas Fields, Western Desert, Egypt

Gas Pipeline, Piping Systems, and Steel Structures Construction
Tarek & El-Salam Gas Fields, Western Desert, Egypt

Project

Gas Pipeline, Piping Systems, & Steel Structures Construction

Location

Tarek & El-Salam Gas Fields, Western Desert, Egypt

Description

The project involved the installation of a pipeline designed to collect gas from the wellhead and transport it to the gas collection station. The scope of work encompassed all mechanical and civil works related to the pipeline, including cold cutting and the modification of tie-in points.

The pipeline was constructed using stainless duplex steel, and all welded joints were completed using the GTAW welding process by our qualified team.

The project also included the welding, inspection, testing, and installation of a total of 18,000 diametric inches of piping systems, made from duplex steel, carbon steel, and stainless steel.

Additionally, a large steel-structured pipe rack was built by our experienced workforce to accommodate the pipes, with all operations executed onsite.

Owner

Khalda Petroleum Company

Completion

1997

Project

Gas Pipeline, Piping Systems,
and Steel Structures Construction

Location

Tarek & El-Salam Gas Fields
Western Desert, Egypt

Description

The project involved the installation of a pipeline designed to collect gas from the wellhead and transport it to the gas collection station. The scope of work encompassed all mechanical and civil works related to the pipeline, including cold cutting and the modification of tie-in points.

The pipeline was constructed using stainless duplex steel, and all welded joints were completed using the GTAW welding process by our qualified team.

The project also included the welding, inspection, testing, and installation of a total of 18,000 diametric inches of piping systems, made from duplex steel, carbon steel, and stainless steel.

Additionally, a large steel-structured pipe rack was built by our experienced workforce to accommodate the pipes, with all operations executed onsite.

Owner

Khalda Petroleum Company

Completion

1997