PROJECTS

SELECTED MAJOR PROJECTS

PROJECTS

MORE OFFSHORE OIL & GAS INFRASTRUCTURE PROJECTS

Project

Boat-Landing Replacement & Comprehensive Platform Maintenance

Location

Ras Ghareb, Red Sea

Description

The scope of work included dismantling the existing boat-landing due to wear and tear, fabrication and installation of a new one, and performing comprehensive maintenance on the Amal (A) Platform structure to ensure operational efficiency and safety.

Owner

Al-Amal Petroleum Company (AMAPETCO)

Completion

2013

Project

Boat-Landing Replacement & Comprehensive Platform Maintenance

Location

Ras Ghareb, Red Sea

Description

The scope of work included dismantling the existing boat-landing due to wear and tear, fabrication and installation of a new one, and performing comprehensive maintenance on the Amal (A) Platform structure to ensure operational efficiency and safety.

Owner

Al-Amal Petroleum Company (AMAPETCO)

Completion

2013

Project

Offshore Platform Extension - Fabrication and Installation

Location

Ras Ghareb, Red Sea

Description

The fabrication and installation of a steel extension for Zeitco’s Platform (A) were successfully completed. The extension was designed to increase capacity and enhance safety features of the platform. The scope of work included welding, testing, installation, sandblasting, and painting.

Owner

East Zeit Petroleum Company (Zeitco)

Completion

2015

Project

Offshore Platform Extension - Fabrication and Installation

Location

Ras Ghareb, Red Sea

Description

The fabrication and installation of a steel extension for Zeitco’s Platform (A) were successfully completed. The extension was designed to increase capacity and enhance safety features of the platform. The scope of work included welding, testing, installation, sandblasting, and painting.

Owner

East Zeit Petroleum Company (Zeitco)

Completion

2015

Project

Comprehensive Offshore Platform Maintenance

Location

Ras Ghareb, Red Sea

Description

EL-KHOLY secured a comprehensive 5-year maintenance contract with SUCO. This contract included the maintenance of all offshore platforms in the Red Sea Region, such as the SWGEZ, RF-A, and RF-B platforms.

The scope of work involved the provision of skilled manpower, such as field engineers and certified quality control engineers, to carry out rigorous inspections and tests on welds and coating.

Additionally, offshore maintenance crews were tasked with a variety of responsibilities, including scaffolding, the fabrication and upkeep of piping networks, sandblasting, and coating. To ensure the highest quality of work, we also provided state-of-the-art equipment for all maintenance activities.

Owner

SUCO

Completion

2020

Project

Comprehensive Offshore Platform Maintenance

Location

Ras Ghareb, Red Sea

Description

EL-KHOLY secured a comprehensive 5-year maintenance contract with SUCO. This contract included the maintenance of all offshore platforms in the Red Sea Region, such as the SWGEZ, RF-A, and RF-B platforms.

The scope of work involved the provision of skilled manpower, such as field engineers and certified quality control engineers, to carry out rigorous inspections and tests on welds and coating.

Additionally, offshore maintenance crews were tasked with a variety of responsibilities, including scaffolding, the fabrication and upkeep of piping networks, sandblasting, and coating. To ensure the highest quality of work, we also provided state-of-the-art equipment for all maintenance activities.

Owner

SUCO

Completion

2020

Project

Boat-Landing Replacement

Location

Red Sea, Egypt

Description

An offshore and diving services project in collaboration with the Egyptian Maintenance Company (EMC). The scope of work involved the fabrication, welding, testing, and installation of a new boat-landing, equipped with rubber and tire fenders. As part of the project, the dismantling of the existing boat-landing was carried out. All work, including diving services and underwater structure repairs, was executed at Platform WP-C.

Owner

PETROGULF MISR

Lead Contractor

Egyptian Maintenance Company

Completion

2018

Project

Boat-Landing Replacement

Location

Red Sea, Egypt

Description

In collaboration with the Egyptian Maintenance Company (EMC), EL-KHOLY carried out the replacement of one of PETROGULF's boat-landings at platform WP-C. The scope of work included dismantling the damaged boat-landing, fabrication, welding, testing, and installation of the new structure equipped with rubber and tire fenders, in addition to providing diving services and performing underwater repairs.

Owner

PETROGULF

Lead Contractor

Egyptian Maintenance Company

Completion

2018

PROJECTS

MORE ONSHORE ENERGY INFRASTRUCTURE PROJECTS

Project

Oil Pumps Replacement & Chamber Maintenance

Location

Eastern Desert, Egypt

Description

The project scope involved replacing six oil pumps to transport oil from the fields in Ras Ghareb to the tanks farm. Additionally, it included maintaining the steel-structured oil pump chamber, which involved replacing the existing piping network, sandblasting, and repainting.

Owner

The General Petroleum Company

Completion

2019

Project

Oil Pumps Replacement & Chamber Maintenance

Location

Eastern Desert, Egypt

Description

The project scope involved replacing six oil pumps to transport oil from the fields in Ras Ghareb to the tanks farm. Additionally, it included maintaining the steel-structured oil pump chamber, which involved replacing the existing piping network, sandblasting, and repainting.

Owner

The General Petroleum Company

Completion

2019

Project

Pump Installation

Location

Tarek & El-Salam Gas Fields, Western Desert, Egypt

Description

The scope of work involved the installation of a pump to inject saltwater into wells, including tasks such as welding, testing, sandblasting, and painting.

Owner

Khalda Petroleum Company

Completion

1997

Project

Pump Installation

Location

Tarek & El-Salam Gas Fields, Western Desert, Egypt

Description

The scope of work involved the installation of a pump to inject saltwater into wells, including tasks such as welding, testing, sandblasting, and painting.

Owner

Khalda Petroleum Company

Completion

1997

Project

Comprehensive Maintenance of Various-Sized Storage Tanks

Location

Zeit Bay, Red Sea

Description

Comprehensive maintenance of three storage tanks. The scope of work included the necessary welding, testing, sandblasting, and repainting of the tanks’ bodies, as well as the full replacement of the existing firefighting system.

Owner

East Zeit Petroleum Company (Zeitco)

Completion

2007

Project

Comprehensive Maintenance of Various-Sized Storage Tanks

Location

Zeit Bay, Red Sea

Description

Comprehensive maintenance of three storage tanks. The scope of work included the necessary welding, testing, sandblasting, and repainting of the tanks’ bodies, as well as the full replacement of the existing firefighting system.

Owner

East Zeit Petroleum Company (Zeitco)

Completion

2007

Project

Construction of Various-Sized Storage Tanks

Location

El-Alamein, Western Desert, Egypt

Description

Construction and erection of six storage tanks of various sizes. The scope of work involved fabrication activities carried out in one of our workshops. The fabrication included welding, testing, sandblasting, and painting, in addition to the transportation and on-site erection of the tanks using our equipment.

Owner

South Dabaa Petroleum Co. (DAPETCO)

Completion

2006

Project

Construction of Various-Sized Storage Tanks

Location

El-Alamein, Western Desert, Egypt

Description

Construction and erection of six storage tanks of various sizes. The scope of work involved fabrication activities carried out in one of our workshops. The fabrication included welding, testing, sandblasting, and painting, in addition to the transportation and on-site erection of the tanks using our equipment.

Owner

South Dabaa Petroleum Co. (DAPETCO)

Completion

2006

Project

Firefighting & HVAC Systems Remediation

Location

Hurghada, Sharm El-Sheikh, and Port Said

Description

Complete remediation of firefighting and HVAC systems at General Electric working sites in Hurghada, Sharm El-Sheikh, and Port Said.

Owner

General Electric

Lead Contractor

KOONTZ-WAGNER

Completion

2017

Project

Firefighting & HVAC Systems Remediation

Location

Hurghada, Sharm El-Sheikh, and Port Said

Description

Complete remediation of firefighting and HVAC systems at General Electric working sites in Hurghada, Sharm El-Sheikh, and Port Said.

Owner

General Electric

Lead Contractor

KOONTZ WAGNER

Completion

2017

Project

T-Oil Station Rehabilitation

Location

Abu-Senan, Western Desert, Egypt

Description

The project involved:

  • Sandblasting and painting of three storage tanks, each with a capacity of 385 cubic meters.
  • Rehabilitation of the station’s drainage network.
  • Fabrication and erection of seven lighting towers including installation of all lighting fixtures and connections.
  • Installation and connection of a diesel pump and its control board.
  • Supply, installation, testing, and commissioning of two jockey pumps and connecting them to the firefighting network.
  • Supply and installation of the station’s foam skid system as well as the construction and erection of a steel-structured control unit chamber.
  • Supply, installation, laying, welding, and testing of the firefighting network within the station, including the construction and erection of the steel-structured chamber that houses the valves, hydrants, and all network accessories.
  • Construction and erection of a steel-structured firefighting pump chamber and the supply of an overhead crane at the station.
  • Construction of a canopy for the air compressor at the condensate plant.

Owner

The General Petroleum Company

Completion

2019

Project

T-Oil Station Rehabilitation

Location

Abu-Senan, Western Desert, Egypt

Description

The project involved:

  • Sandblasting and painting of three storage tanks, each with a capacity of 385 cubic meters.
  • Rehabilitation of the station’s drainage network.
  • Fabrication and erection of seven lighting towers including installation of all lighting fixtures and connections.
  • Installation and connection of a diesel pump and its control board.
  • Supply, installation, testing, and commissioning of two jockey pumps and connecting them to the firefighting network.
  • Supply and installation of the station’s foam skid system as well as the construction and erection of a steel-structured control unit chamber.
  • Supply, installation, laying, welding, and testing of the firefighting network within the station, including the construction and erection of the steel-structured chamber that houses the valves, hydrants, and all network accessories.
  • Construction and erection of a steel-structured firefighting pump chamber and the supply of an overhead crane at the station.
  • Construction of a canopy for the air compressor at the condensate plant.

Owner

The General Petroleum Company

Completion

2019

Project

Storage Tanks Construction & Station Rehabilitation

Location

El-Max, Alexandria

Description

The project involved:

  • Complete fabrication, erection, sandblasting, and painting of two gasoline storage tanks, with capacities of 1,000 and 2,000 cubic meters, each equipped with an internal floating roof.
  • Rehabilitation of the station’s drainage network.
  • Fabrication and erection of lighting towers including installation of all lighting fixtures and connections.
  • Installation and connection of a diesel pump and its control board.
  • Supply, installation, testing, and commissioning of two jockey pumps and connecting them to the firefighting network.
  • Supply and installation of the station’s foam skid system as well as the construction and erection of a steel-structured control unit chamber.
  • Supply, installation, laying, welding, and testing of the firefighting network within the station, including the construction and erection of the steel-structured chamber that houses the valves, hydrants, and all network accessories.

Owner

Cooperation Petroleum Company

Completion

2024

Project

Storage Tanks Construction & Station Rehabilitation

Location

El-Max, Alexandria

Description

The project involved:

  • Complete fabrication, erection, sandblasting, and painting of two gasoline storage tanks, with capacities of 1,000 and 2,000 cubic meters, each equipped with an internal floating roof.
  • Rehabilitation of the station’s drainage network.
  • Fabrication and erection of lighting towers including installation of all lighting fixtures and connections.
  • Installation and connection of a diesel pump and its control board.
  • Supply, installation, testing, and commissioning of two jockey pumps and connecting them to the firefighting network.
  • Supply and installation of the station’s foam skid system as well as the construction and erection of a steel-structured control unit chamber.
  • Supply, installation, laying, welding, and testing of the firefighting network within the station, including the construction and erection of the steel-structured chamber that houses the valves, hydrants, and all network accessories.

Owner

Cooperation Petroleum Company

Completion

2024

Project

Medium Voltage Power Cable Installation

Location

Rahmi Concession, Red Sea Region

Description

The project involved the extension of a 5-kilometer medium voltage power cable, along with the associated civil works. Additionally, it included the supply, installation, and testing of 9ea splicing kits, 2ea end termination kits, and 2ea cable glands.

Owner

PETRONEFERTITI

Completion

2022

Project

Medium Voltage Power Cable Installation

Location

Rahmi Concession, Red Sea Region

Description

The project involved the extension of a 5-kilometer medium voltage power cable, along with the associated civil works. Additionally, it included the supply, installation, and testing of 9ea splicing kits, 2ea end termination kits, and 2ea cable glands.

Owner

PETRONEFERTITI

Completion

2022

PROJECTS

MORE PIPELINES & PIPING PROJECTS

Project

Offshore Pipeline Construction

Location

Oyoun Moussa, Red Sea

Description

Construction of an offshore pipeline was carried out at the Oyoun Moussa Electricity Station to supply it with Mazot. The operations included submerging and laying the pipeline on the seabed, welding, and installation. The pipeline, with an 8-inch diameter and SCH 160 rating, spans a total length of 3 kilometers.

Owner

Ministry of Electricity and Renewable Energy
Egyptian Electricity Holding Company

Lead Contractor

Maridive & Oil Services

Completion

2005

Project

Offshore Pipeline Construction

Location

Oyoun Moussa, Red Sea

Description

Construction of an offshore pipeline was carried out at the Oyoun Moussa Electricity Station to supply it with Mazot. The operations included submerging and laying the pipeline on the seabed, welding, and installation. The pipeline, with an 8-inch diameter and SCH 160 rating, spans a total length of 3 kilometers.

Owner

Ministry of Electricity and Renewable Energy
Egyptian Electricity Holding Company

Lead Contractor

Maridive & Oil Services

Completion

2005

Project

Offshore Pipeline & Steel Structures Construction

Location

Abu Rudeis, Red Sea

Description

The construction of an offshore pipeline extension for transporting crude oil from offshore wells to an onshore separation station was successfully completed. The pipeline extension, with a 10-inch diameter and SCH 80 rating, spans a total length of 1 kilometer.

As part of the project, two steel structures were constructed: one to house the power generator and the other to accommodate the pumps station, both designed to support the pipeline's operations. The scope of work included welding the pipeline parts, assembling the necessary infrastructure, and transporting materials to the onshore site.

To ensure the pipeline's safety and operational efficiency, various tests were conducted, including hydrostatic pressure tests and integrity assessments. These tests were crucial in confirming the pipeline's reliability and readiness for operation.

Owner

Misr Petroleum Company

Completion

2014

Project

Offshore Pipeline & Steel Structures Construction

Location

Abu Rudeis, Red Sea

Description

The construction of an offshore pipeline extension for transporting crude oil from offshore wells to an onshore separation station was successfully completed. The pipeline extension, with a 10-inch diameter and SCH 80 rating, spans a total length of 1 kilometer.

As part of the project, two steel structures were constructed: one to house the power generator and the other to accommodate the pumps station, both designed to support the pipeline's operations. The scope of work included welding the pipeline parts, assembling the necessary infrastructure, and transporting materials to the onshore site.

To ensure the pipeline's safety and operational efficiency, various tests were conducted, including hydrostatic pressure tests and integrity assessments. These tests were crucial in confirming the pipeline's reliability and readiness for operation.

Owner

Misr Petroleum Company

Completion

2014

PROJECTS

MORE COMMERCIAL & RESIDENTIAL SECTORS PROJECTS

Project

Fabrication and Installation of Chiller and Firefighting Piping Systems

Location

Cairo, Egypt

Description

The scope of work involved providing manpower, including field engineers and certified quality control engineers to conduct inspections and tests on welds and paint. Skilled technicians were also supplied for welding and installation of the chillers piping systems and firefighting pumps and piping systems at the City Centre Mall in Cairo. Additionally, top-tier equipment was provided. The tasks covered everything from scaffolding to the fabrication of all piping networks, as well as sandblasting and painting.

Owner

City Centre Mall

Lead Contractor

Debbas Group

Completion

2002

Project

Fabrication and Installation of Chiller and Firefighting Piping Systems

Location

Cairo, Egypt

Description

The scope of work involved providing manpower, including field engineers and certified quality control engineers to conduct inspections and tests on welds and paint. Skilled technicians were also supplied for welding and installation of the chillers piping systems as well as the firefighting pumps and piping systems at the City Centre Mall in Cairo. Additionally, all required equipment was provided. The tasks covered everything from scaffolding works to the fabrication of all piping networks, as well as sandblasting and painting.

Owner

City Centre Mall

Lead Contractor

Debbas Group

Completion

2002

Project

Fabrication and Installation of Chiller and Firefighting Piping Systems

Location

Khartoum, Sudan

Description

The scope of work included providing manpower, such as field engineers and certified quality control engineers, to conduct inspections and tests on welds and paint. Additionally, skilled technicians were supplied for welding and installation of chillers piping systems and firefighting pumps and piping systems, along with state-of-the-art equipment. The tasks covered everything from scaffolding to the fabrication of all piping networks. Works also included sandblasting and painting.

Lead Contractor

Drake & Scull

Completion

2015

Project

Fabrication and Installation of Chiller and Firefighting Piping Systems

Location

Khartoum, Sudan

Description

The scope of services included the deployment of qualified manpower, such as site engineers and certified QC inspectors, responsible for carrying out welding and coating inspections and related testing activities. Experienced technicians were assigned to execute welding, erection, and installation works for the chiller piping networks and the firefighting pumps and piping systems. All necessary tools, machinery, and equipment were supplied as part of the works. The activities encompassed the complete range of works, starting from scaffolding installation through to the fabrication and assembly of all piping systems, including surface preparation, sandblasting, and final painting works.

Lead Contractor

Drake & Scull

Completion

2015

PROJECTS

MORE FOOD PRODUCTION SECTOR PROJECTS

Project

El-Ossrah Sugar Factory - Steel Structure Construction

Location

El-Ain El-Sokhna

Description

This project involved the construction and erection of all steel structures for the production section at El-Ossrah Sugar Factory, including the fabrication and installation of all handrails and grating.

Lead Contractor

SIAC Construction

Completion

2013

Project

El-Ossrah Sugar Factory - Steel Structure Construction

Location

El-Ain El-Sokhna

Description

This project involved the construction and erection of all steel structures for the production section at El-Ossrah Sugar Factory, including the fabrication and installation of all handrails and grating.

Lead Contractor

SIAC Construction

Completion

2013