PROJECTS

PIPELINES & PIPING PROJECTS

PROJECTS

MORE PIPELINES & PIPING PROJECTS

Project

Offshore Pipeline Construction

Location

Oyoun Moussa, Red Sea

Description

Construction of an offshore pipeline was carried out at the Oyoun Moussa Electricity Station to supply it with Mazot. The operations included submerging and laying the pipeline on the seabed, welding, and installation. The pipeline, with an 8-inch diameter and SCH 160 rating, spans a total length of 3 kilometers.

Owner

Ministry of Electricity and Renewable Energy
Egyptian Electricity Holding Company

Lead Contractor

Maridive & Oil Services

Completion

2005

Project

Offshore Pipeline Construction

Location

Oyoun Moussa, Red Sea

Description

Construction of an offshore pipeline was carried out at the Oyoun Moussa Electricity Station to supply it with Mazot. The operations included submerging and laying the pipeline on the seabed, welding, and installation. The pipeline, with an 8-inch diameter and SCH 160 rating, spans a total length of 3 kilometers.

Owner

Ministry of Electricity and Renewable Energy
Egyptian Electricity Holding Company

Lead Contractor

Maridive & Oil Services

Completion

2005

Project

Offshore Pipeline & Steel Structures Construction

Location

Abu Rudeis, Red Sea

Description

The construction of an offshore pipeline extension for transporting crude oil from offshore wells to an onshore separation station was successfully completed. The pipeline extension, with a 10-inch diameter and SCH 80 rating, spans a total length of 1 kilometer.

As part of the project, two steel structures were constructed: one to house the power generator and the other to accommodate the pumps station, both designed to support the pipeline's operations. The scope of work included welding the pipeline parts, assembling the necessary infrastructure, and transporting materials to the onshore site.

To ensure the pipeline's safety and operational efficiency, various tests were conducted, including hydrostatic pressure tests and integrity assessments. These tests were crucial in confirming the pipeline's reliability and readiness for operation.

Owner

Misr Petroleum Company

Completion

2014

Project

Offshore Pipeline & Steel Structures Construction

Location

Abu Rudeis, Red Sea

Description

The construction of an offshore pipeline extension for transporting crude oil from offshore wells to an onshore separation station was successfully completed. The pipeline extension, with a 10-inch diameter and SCH 80 rating, spans a total length of 1 kilometer.

As part of the project, two steel structures were constructed: one to house the power generator and the other to accommodate the pumps station, both designed to support the pipeline's operations. The scope of work included welding the pipeline parts, assembling the necessary infrastructure, and transporting materials to the onshore site.

To ensure the pipeline's safety and operational efficiency, various tests were conducted, including hydrostatic pressure tests and integrity assessments. These tests were crucial in confirming the pipeline's reliability and readiness for operation.

Owner

Misr Petroleum Company

Completion

2014